March 27, 2008

Jacobean Socks Started!

I started the Jacobean socks for the Sock Knitters Pentathlon with the “Queen Kahuna Aloha” cast on. It’s really an easy cast on ….. I’ve tried others and will definitely be using this one again. I did increase the sts to 70 from 62 mostly to get them over my high instep. I'm using Knit in Color's Smooshy in the Ruby River colorway. I already have both toes done. Tonight it will be beginning the pattern. A lot of knitters have already finished this pair and most have said that they were "quick knits."

Weather ..... snow, again! In fact, we have a two-hour late start today because of it. I pray that all the young people make it safely to school .... it's still snowing at almost 9:30 and the visibility didn't look the best as I turned toward the high school. Time to get busy .... TLGB

March 26, 2008

SOTS 2 - Clue #7 Completed


Better late than never! That's the theme of my SOTS2 ..... the KAL actually ended last Friday, but I was not close to completion at that time. So, now I can take my time .... I just finished Hint #7 last night. You should be able to see the lifeline (white dental floss) that's at the beginning of Hint 7. I decided to just pin out the area of the completed portion. Now it's on to Hint #8 ... I'm already about six rows into that (60 rows total), but it does knit quickly now. I feel a lot more comfortable with lace knitting after doing this stole. I have a couple other lace shawls that I have both the pattern and yarn, but haven't felt confident enough to do them ... now I will do them ..... sometime!
I hope to start the Jacobean Socks for the Sock Knitters Pentathalon KAL. It's a toe-up sock .... out of my comfort zone, but I plan to follow the pattern for the experience. If it doesn't fit when I'm done, I'm sure that I'll be able to find a happy recipient. TLGB

March 24, 2008

Serendipity Socks Completed!

I wanted to finish the January shipment from RSC before the March shipment came ..... well, I missed it by about 5 hours. The socks are completed .... now on to the Jacobean Socks for another KAL. Here's the pic of the finished socks ... I didn't like the way the short row heel looked,so did do the heel flap and short row heel turn. I did use the star toe that was part of the pattern. I'm also using these for the SAM5 KAL for my March socks.

The March shipment is a gorgeous colorway and I do like the pattern. It's top down ... will probably wait a couple of weeks before starting. Better get back to knitting. TLGB

March 23, 2008

SOTS 2 and RSC Socks

Didn't get the SOTS 2 finished on time, but I'm going to try to finish this week ..... I'm about done with Hint #7, so just have #8 and #9 to do completely. The increasing that was done has been decreased, so it's just straight knitting. I feel a lot more confident in knitting from a chart after this KAL.
DD informed this afternoon that she had received her March RSCshipment from BMFA,......so mine isn't here, yet. Probably tomorrow ..... guess I'd better finish the January socks tonight. DD had knitted the Serendipity socks, but they tended to fall down on her .... so enter Mom's tighter knitting and they will fit to a tee. I've worn the socks she knitted this past week and they are fine .... on me, that is. DD inherited the skinnier legs from DH's family .... not the abundant hips and legs from my family genes. Here's a pic of progress so far ..... about 12 rows remain on the pattern and then I start the toes. I tried the short row heel of the pattern, but didn't care for it .... frogged .... and did my usually heel flap with heel turn. These will also fulfill my participation in the SAM5 KAL for March. TLGB

March 17, 2008

SOTS Hint #6 Completed

After a break from SOTS 2 this week-end when I was knitting on the RSC Serendipity socks from their Jan. club offering, I got back to the stole last night, this morning (a two-hour late start due to snow .....again!), and after school ..... Hint #6 is completed. I just pinned the stole to our drapery .... didn't feel like taking an hour or so to do it on a board as I've done previously. Now .... on to Hints #7, #8, and #9. Others who have already completed the stole said that these go fast. Well, I had done so well keeping up through Hint #5 in late March. For some reason, I just didn't feel like working on it, so worked on some smaller projects. Now, I'm ready .... well, the stole is to be completed this week. Don't believe I'll make that ..... maybe by next Monday since we have a long week-end break from school.
I've completed the Serendipity socks through the gussets .... want dd to try them on since the ones that she knitted were a bit loose for her. We'll trade .... I already have the ones that she knitted, but won't wear them until I finish hers. I'm also just starting the gussets for the River Rapids Socks that are for someone special that I just met a while back. Well, back to knitting! TLGB

March 14, 2008

SOTS 2 Progress

I've been frantically working on SOTS 2, trying to catch up, somewhat. I've completed about half of Hint #6, so will do serious knitting this afternoon after school and tonight to get that completed and get Hint #7 started. Hopefully, I can get some of Hint #8 done before the week-end ends. The final hint is to be posted today, so that will have to be done the first part of the week. I was doing soooooo well through Hint #4, but fell behind when conference time came at school and a lot of other "busy"ness there. Now things have slowed down a little, so knitting will progress.

I need to finish the Serendipity socks and get another pair started ..... hopefully, there won't be any more "snow days" where school is dismissed ...... those are my knitting "marathon" times. We've had enough of those here in northern Iowa for one year. TLGB

March 12, 2008

A Late Hint #5!

Hint 5 for SOTS 2 was late ... just finished it earlier this evening. The final hint, #9, comes out on Friday, so I am behind ..... but this is one item that will be finished. I hadn't done any knitting on the stole since the Des Moines Metro Knitters Retreat on Feb. 23-24 ... only did a couple of rows there. I decided to lay it aside and work on some "less Intense" knitting ..... yup, "mindless knitting". I did lengthen the stole by two repeats at the center of the stole, accounting for about 2.5 additional inches.

I'm been working on the January socks for RSC, Serendipity. I have both socks on ml finished through the heels ..... I did change the short row heel to a heel flap and heel turn. Hopefully, I can get them finished this week-end. I'm also in the SKP2008 KAL, so need to start those socks in some DIC Smooshy sock yarn.

While visiting dd last week-end in Omaha, visited the new and vastly improved Personal Threads LYS. Both of us purchased two different color groupings of Galway Worsted for the Infant/Toddler Tulip Sweater from Dream In Color. We both ordered kits with the DIC yarn, but decided to try other yarn. DD has 6+ friends that are expecting before summer is over, so she is already finishing her 3 Tulip Sweater. TLGB

March 6, 2008

What a Great Time!

My dd and I met in Des Moines on Feb. 23-24 for the Metro Knitters Winter Retreat. Over 40 knitters were registered and did we ever knit. The two of us went up to the motel room around 12:30 a.m. after having started knitting at 1:00 p.m. We were down again in the morning about 8:00 to start knitting until a little before noon. There were breaks, however, especially for the snacks that everyone had brought to share. I learned a couple of helpful techniques from those present and just enjoyed talking with the other ladies to see what favorite knitting projects each had. Talking with Tamara, the area knitting "professor", she made me inspired me to try "toe-up" socks again. I have a terribly high instep, so have adjusted top-down patterns to accomodate that .... not so with toe-up for me. Well, so I started the Dec. 2008 Rocking Sock Club selection with a pattern by Cat Bordhi .... well, I CO my usual sts .... finished the toe, thought it looked a bit wide, but also thought it would draw in with the foot ..... it did somewhat ..... I finished the patterned instep, learned a new way for a toe-up heel .... really liked it .... and then tried the sock on again ..... it was huge. I contemplated just using them as slipper socks, but decided that I liked the yarn too much to not wear it more. So ..... to the frog pond they went .... back to the toe for the next smallest size. That's all I have left of both socks since I do 2 on ml .... here's the pic before the froggin' session.
The last time we visited dd, she had ordered some Tulip Sweater kits .... here's the sweater (size 2) so far .... it will be for our newest neighbor, little Savannah across the street.

I haven't been working on the SOTS2 for the past couple of weeks .... finally decided to increase the length at the very middle ..... have the first repeat done of the increase with two more to go.... am behind two hints so will work more on it at dd's this week-end. Since we had parent-teacher conferences this week, we don't have school on Friday .... I'll get an early start.

TLGB